SYSTEMIC PERSPECTIVE OF WORK IN PROGRESS AND ON TIME DELIVERY IN AEROSPACE COMPOSITES MANUFACTURING COMPANY IN MALAYSIA
DOI:
https://doi.org/10.32890/jtom2016.11.2.9Keywords:
On time delivery, Resource based view theory, WIPAbstract
This paper explaines the significance of managing work in progress (WIP) and its impact on the on time delivery from a systemic perspective in aerospace composite manufacturing company in Malaysia. Research was done within an aerospace composites manufacturing company in Malaysia. A total of four years of data collection on WIP was done and co-related to on time delivery in a linear relationship while applying TOC and RBV. Acknowledgement of WIP as one of critical resources that need to be managed systemically, resource based view (RBV) theory is refered to in explain WIP as a unique, valuable and rare resource that is systemically impacting the whole manufacturing flow. The theory of constraint (TOC) was used to explain the WIP management method through ‘pull’ and ‘push’ to create a continuous flow of products to meet the completion date. WIP is one of manufacturing resource systemically impacting the on time delivery.The way WIP is managed contributes a whole lot to the performance and it is critically important in an aerospace manufacturing industry due to its high operations cost. To stay competitiveness in the industry, it is very important that this expectation is met and continuously sustained. Both TOC and RBV theories are complementing each other from a systemic point of view to explain the significance influence of WIP towards the on time delivery in an aerospace composite manufacturing in Malaysia. This paper is originally based on a real, objective scenario and shall be another input to the aerospace composite manufacturing best practices particularly in managing WIP systemically to achieve the targeted on time delivery and to continuously stay competitive in the industry.
Metrics
References
Barney, J. B. (2001). Is The Resource-Based “View†A Useful Perspective for Strategic Management Research? Yes. Academy Of Management Review, 26(1), 41–56.
B. Jorg, K. Andreas, S. R. (2008). Factors Influencing Time and Cost Overruns in Aircraft Projects, (October 2007), 1–4.
Leach, Y. (2009). Boeing 787 : The Dreamliner ( B ), (April 2008), 1–12.
Whybark, D. C. (1993). Global relations between inventory , and delivery date promises manufacturing lead time, 1, 563–569.
Tang, C. S., & Zimmerman, J. D. (2009). Development and Supply Chain Risks : The Boeing 787 Case, 10, 74–87.
Gupta, M. C., & Boyd, L. H. (2008). Theory of constraints: a theory for operations management. International Journal of Operations & Production Management, 28(10), 991–1012. doi:10.1108/01443570810903122
NetSuite. (2013). Manufacturing WIP and Routings. NetSuite, 1–2.
Bridoux, F. (2003). A RESOURCE-BASED APPROACH TO PERFORMANCE AND COMPETITION : An Overview of the Connections between Resources and Competition, (1984), 1–21.
Robert, G. M. (2001). RBV Competitive Advantage - Strategy Formulation
Rouse, W. B. B. C. R. (2010). Understanding Complex Product and Service Delivery Systems.
Lang, L. (2011). Job Shop Scheduling – The Secret To Getting On Time & Reducing Lead Times By “ Dr Lisa †Lang.
Saraswat, P., Kumar, D., & Kumar Sain, M. (2015). Reduction of Work in Process Inventory and Production Lead Time in a Bearing Industry Using Value Stream Mapping Tool. International Journal of Managing Value and Supply Chains, 6(2), 27–35. doi:10.5121/ijmvsc.2015.6203
Francisco, J. (2015). Resource-Based View and Dynamic Capabilities, 50–61.
Ismail, A. I., Rose, R. C., & Uli, J. (2012). The Relationship Between Organizational Resources , Capabilities , Systems And Competitive Advantage. Asian Academy of Management Journal, 17(1), 151–173.
Downloads
Published
How to Cite
Issue
Section
License
Disclaimer
The Journal of Technology and Operation Management (JTOM) has taken all reasonable measures to ensure that material contained in this website is the original work of the author(s). However, the Journal gives no warranty and accepts no responsibility for the accuracy or the completeness of the material; no reliance should be made by any user on the material. The user should check with the authors for confirmation. Articles published in the Journal of Technology and Operation Management (JTOM) do not represent the views held by the editors and members of the editorial board. Authors are responsible for all aspects of their articles except the editorial screen design.