[1]
2026. SUPPLY CHAIN MANAGEMENT IN A CPEC COAL-FIRED POWER PROJECT: A BIBLIOMETRIC ANALYSIS AND DOCUMENT-BASED CASE STUDY OF THE SAHIWAL POWER PLANT. Journal of Technology and Operations Management. 21, 2 (Jul. 2026), 47–67. DOI:https://doi.org/10.32890/jtom2026.21.2.30776.