Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
DOI:
https://doi.org/10.32890/gbmr2020.12.1.4Abstract
In the area of the construction sector, the primary concern is economic growth. There are many issues and challenges associated with it. The growth and rapid development of this industry put their players, mainly the construction firms feeling the heat by competing with each other. The main challenge is the completion period for a particular project. This study was done in Manila, Philippines, where Design and Build (D&B) method has gained much interest and considered very important today. The rise of new innovative systems saw the emergence of new factors in the construction industry that will become future adoption. This study focuses on factors affecting the successful completion period of the construction industry, whereby it is very crucial for the country's economic and market development. A quantitative research methodology was applied in this study. A total of 967 survey questionnaires sent out, and only 396 respondents fit to be analysed. Respondents involved were contractors, consultants, and developers. It was learned that critical success factors in project management play significant roles in driving projects to examine the determinants of success completion time of Design & Build construction projects. Findings from this study shall be used by the authority in drafting a policy guideline for future construction development. It is hoped that this study provides a better understanding of construction challenges for future undertaking.
Downloads
References
Atkinson, R. (1999). Project Management: Cost, Time, and Quality, Its Time to Accept other Success Criteria. International Journal of Project Management, 17(6), 337-342.
Eriksson, P.E., & Westerberg, M. (2011). Effects of cooperative procurement procedures on construction project performance: A conceptual framework, International Journal of Project Management, 29, (2), 197– 208.
Friedlander, M.C., & Roberts, K.M. (1997). Design-Build-The Single Entity Option,
Independent Energy, 1-5.
https://www.schiffhardin.com/Templates/media/files/publications/PDF/single_entity_desig n_build.pdf
Ghamdamsi, A. (2016). Criteria for Selection of Design and Build Procurement Method, Journal of Construction Management, 1-19.
Kharashi, A.A., & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects, Construction Management and Economics, 27 (1), 3-23.
Ling, F.Y. & Kerh, S.H. (2004). Comparing the Performance of Design & Build and Design-Bid- Build Building Projects in Singapore. Architectural Science Review, 47, 163-176.
Love, P., Edwards, D., Irani, Z., & Sharif, A. (2012). Participatory Action Research Approach to Public Sector Procurement Selection. Journal of Construction Engineering Management, 138 (3), 311–322.
Mohsini, R., Sirpal, R. & Davidson, C. (1995). Procurement: A comparative analysis of construction management and traditional building processes. Building Research and Information, 23,285-290. DOI: 10.1080/09613219508727477.
Muriro, A. (2015). Design and Build Procurement Method In Practice: Key Challenges And Practice Based Enablers, Theses for the Degree of Professional Doctorate in Construction Management, July 2015, 1-494.
Masterman, J.W.E. (1992). An Introduction to Building Procurement Systems. Spon.
Minchin, R., Jr., Li, X., Issa, R., & Vargas, G. (2013). Comparison of Cost and Time Performance of DesignBuild and Design-Bid-Build Delivery Systems in Florida. Journal Construction Engineering Management, 139(10), 04013007
Olanrewaju, A.L., & Abdul-Aziz, A.R. (2015). An overview of the construction industry, Building Maintenance Processes and Practices, 9-32.
Oyegoke, A.S., Dickson, M., McDermott, P., Khalfan, M., & Rowlinson, S. (2009). Construction project procurement routes: An in-depth critique, International Journal of Managing Projects in Business, 2(3), 338-354, retrieved on January 29, from file:///C:/Users/USER/Downloads/Constructionprojectprocurementroutes_anin- depthcritique2009.pdf
Radhia, A. & Bouzid, A. (2017). Transport Infrastructure and Economic Growth. Journal of Infrastructure Development, 9(2).
Rwelamila, P.D., & Edries, R. (2007). Project procurement competence and knowledge base of civil engineering consultants: An empirical study, Journal of Management in Engineering, 23(4), 182-192.
Seng, N. W., & Yusof, A. M. (2006). The success factors of design and build procurement method: a literature visit, Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference, 1-11.
Skitmore, R. M., & Marsden, D. E. (1988). Which procurement system? Towards a universal procurement selection technique, Construction Management and Economics, 6 (1), 71–89.
The survey system, (2018). https://surveysystem.com/sscalc.htm, 2018.
Shamasâ€Urâ€R. T., & Ogunlana, S.O. (2008) Problems causing delays in major construction projects in Thailand, Construction Management and Economics, 26 (4), 395- 408, DOI: 10.1080/01446190801905406
Triguero, R. (2018). Funding today's construction industry, The Manila Times, August 4, 2018, retrieved on April 28, from https://www.manilatimes.net/2018/08/04/business/columnists- business/funding-todays-construction-industry/426433/
Turina, N., Radujkovic. M., & Pusic, D. C. (2008). Design and build in comparison with the traditional procurement and possibility of its application in the Croatian construction industry, 8th International Conference: Organization, Technology and Management in Construction, 17th -20th of September 2008 Umag, Hrvatska, Available at: http://bib.irb.hr/datoteka/362416.65-Turina_ RadujkovicCarPusic.pdf (Accessed: April 2 2011).
Williams, T. (2016). Identifying Success Factors in Construction Projects: A case study of Project Management Journal, 41, 97-112.
Yildiz, A.E., Dikmen, I., Birgonul, M.T., Ercoskun, K. & Alten, S. (2014). A Knowledge-Based Risk Mapping Tool for Cost Estimation of International Construction Projects. Automation in Construction, 43, 144-155.
Zakaria, S.F., Zin, R.M., Mohamad, I., Balubaid, S., Mydin, S.H. & Rahim, E.M.R. (2017). Critical Success Factors in Infrastructure Projects. Proceedings of the 3rd International Conference on Construction and Building Engineering (ICONBUILD) 2017, AIP Conference Proceeding.
Downloads
Published
How to Cite
Issue
Section
License
Disclaimer
Global Business Management Review (GBMR) has taken all reasonable measures to ensure that material contained in this website is the original work of the author(s). However, the Journal gives no warranty and accepts no responsibility for the accuracy or the completeness of the material; no reliance should be made by any user on the material. The user should check with the authors for confirmation.
Articles published in the Global Business Management Review (GBMR) do not represent the views held by the editors and members of the editorial board. Authors are responsible for all aspects of their articles except the editorial screen design.
Submission of an article is done with the understanding that the article has not been published before (except in the form of an abstract or as part of a published lecture, or thesis) that it is not under consideration for publication somewhere else; that if and when the article is accepted for publication, the author's consent to automatic transfer of the copyright to the publisher.